Main project settings
The Main project settings
is the first thing on the project setup checklist.
In this step, you decide:
- if using survey in the project.
- if your project is classic or longitudinal.
You can modify these settings anytime during your project development.
Activity
- Go to
Main project settings
on Project Setup. - Click
Enable
for the option of ‘Use surveys in this project’. - Leave the other two options as they are.
Types of project
There are two basic project types in REDCap, ‘classic’ and ‘longitudinal’.
Classic projects
A classic project is a set of data collection instruments, designed for a single round of data collection (which can last for any amount of time). Data can be entered either by researchers or by participants.
Longitudinal projects
A longitudinal study captures data from the same cohort over time, usually at defined points. It may also track more than one cohort, for example, a control group and an intervention group.